Port of Otago Crane Rail
Client: Port of Otago
Contractor: Albert Smith Industries
Status: Completed 2012
This project consisted of a full Investigation into the cause of the ship loader crane rail failure at Port of Otago. The project was a joint venture with Albert Smith Industries, Novare Design and Gantrax. It included crane loading analysis and running rail specification and repair for the existing concrete deck. Novare also conducted a Rating study of the wharf structure supporting the ship loader crane at Port of Otago.